Next week, 03/04/2013 – 03/08/2013 Material and equipment deliveries and installation work will continue on all floors inside the building. Roof work, work on the new sidewalks around the building, and the dismantling of the construction hoist on the building exterior will also continue.
The following week, 03/11/2013 – 03/15/2013 Material and equipment deliveries and installation work will continue on all floors and roofs. Sidewalk work and dismantling of the construction hoist on the building exterior will also continue.
We anticipate the take down of the 14th Street sidewalk shed to begin within the next 2 weeks.