Next week (January 23 to January 27), Superstructure work will continue at and 3rd, 4th and 5th floor levels. All sidewalk sheds around the site have been opened up.
The following week (January 30 to February 3), we will continue superstructure concrete and slabs on 4th and 5th floor levels.
This weekend the site will be open on Saturday, January 21st for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.
In addition to the normal work this Saturday we will be installing the main auditorium trusses at the 3rd floor level. During the installation 13th St. will be closed as well as some lanes on 5th Ave. Pedestrian traffic will also be temporarily closed on the east side of 5th ave. for safety during the lifts.
Please do not hesitate to contact me with any questions or concerns. Thank you.
Jane R. Crotty
Senior Vice President
George Arzt Communications, Inc.
123 William Street, 22nd Fl.
New York, NY 10038
T (212) 608-0333